We know that you can face a vast array of environmental compliance challenges including:
- Water Quality – Stormwater, Wastewater, Groundwater, Well-water and Surface Water;
- Environmental Due Diligence – All Appropriate Inquiries, Phase I’s/Phase II’s, Environmental Compliance Reviews and Audits
- Sustainable Materials – Recycling, Reuse and Repurposing of Materials;
- Waste – Organic, Solid, Hazardous and other Waste;
- Geographic Information Services (GIS) – Spatial Databases; GPS Inventories, plots, varietal blocks and soils maps, and development
Florida Projects
Florida Projects
-
FAST® attached growth media provides highly stable denitrification.
-
Installation of MicroFAST® in readily available septic tanks.
-
Commercial MicroFAST® for landscape irrigation in sandy soils.
-
Commercial drip system installation while property was under construction.
-
BioBarrier® MBR & HSMBR® (Membrane Bioreactors 500 to 27,000+ gpd)
Ask us about the 500 gpd BioBarrier® system in the University of Miami Net Zero Water Dorm!
-
Residential MicroFAST® to drip irrigation, Biscayne Bay.
-
MyFAST® 10,000 to 160,000+ gpd modular Nitrogen reduction systems.
-
MicroFAST® ideal for properties near waterways.
MicroFAST FL Case Study
Click to enlarge.